CARTOGRAMAYour area
MX
Measure your neighborhoodDiscuss a project

Back to Land and Urban Regulation

New neighborhoods arrive late

42.7% of the housing built since 2016 is in the quintile with the least proximity, and neighborhoods from twenty years ago remain below the consolidated city.

New neighborhoods arrive late · Spain · Where do Spain’s cities build, and how much proximity do their new neighborhoods get?

Building → CityLand and Urban RegulationTerritorial transformationChange over time

42.7% of the 97,475 dwellings built from 2016 to August 2026 in Madrid, Barcelona, Valencia, Zaragoza, Seville and Málaga are in the quintile with the least proximity, where 20.0% of the population lives. New neighborhoods score 36.2 on the Everyday Proximity Index, compared with 51.8 in the consolidated city, and those from 2000 to 2004 are still at 38.4.

01

The problem

New housing arrives before shops, the health center and the school. Crossing the Cadastre’s year of construction with the proximity of each section shows how much of what is new is built far from everyday life, and whether time corrects it.

02

What we found

  • Four in ten new dwellings, in the quintile with the least proximity

    Of the 97,475 dwellings built from 2016 to August 2026 in sections with an index, 42.7% are in quintile 1, where 20.0% of the population lives; quintile 5 received 9.1%. Per thousand residents, quintile 1 added 26.0 new dwellings and quintile 5, 5.6. It happens in all six cities: in Zaragoza, 52.6% with 25.6% of the population; in Barcelona, 18.2% with 6.0%.

  • The newer the housing, the farther everything is

    If each dwelling takes the index of its section, those built before 1940 average 58.9 points and those built since 2020, 35.8. Across the six cities, each decade falls below the one before. Barcelona falls the least (from 63.4 to 50.7) and Madrid the most (from 59.0 to 35.8).

  • Twenty years have not been enough

    The 459 sections where half or more of the dwellings date from 2000 onward are home to 910,646 people, 11.4% of the total. Their index is 36.2, compared with 51.8 in the consolidated city, and 46.1% of their residents live in quintile 1 (16.6% in the consolidated city). New neighborhoods from 2000 to 2004, by the median year of their dwellings, score 38.4; those from 2015 onward, 29.1.

  • The shop is missing, not the park

    Compared with the consolidated city, new neighborhoods score 23.5 points lower in culture, 22.0 in food, 18.4 in health, 17.7 in education and 13.9 in transit. In parks and recreation they score 1.8 higher: they have green space nearby; what they lack is food retail, culture, health facilities and schools.

  • Where building goes today

    Since 2020 the Cadastre has recorded 65,915 new dwellings in the six cities; of those in sections with an index, 44.6% fall in quintile 1. In Madrid, El Cañaveral accounts for 7,368 of 27,719, with an index of 35.6; in Zaragoza, Arcosur (7.4) and Parque Venecia (26.3) lead; in Valencia, Turianova adds 1,367 in a single section with an index of 3.5.

  • More concentrated than in Bogotá

    With the same measure as in Bogotá, floor area of all uses built from 2016 to 2026, quintile 1 concentrates 55.0% with 20.0% of the population, 2.8 times its weight. In Bogotá it was 24.3% and 14.7%, 1.7 times. Each country has its own index: only the concentration is compared.

  • Logistics, also far away

    98.8% of the industrial floor area built since 2016 is in quintile 1. That is why this note measures with dwellings, not square meters.

  • It is not inevitable

    Sevilla Este, whose median dwelling dates from 2010, scores 52.8, above consolidated Seville (42.5); Las Tablas (46.4) is 3.8 points from consolidated Madrid. At the other end, Arcosur scores 7.4, Turianova 3.5 and Sociópolis 1.0.

03

See it on the map

Eleven scenes: where the six cities build, proximity by the age of the housing, new neighborhoods versus the consolidated city, which services they lack and one scene per city. Click a development to see its profile.

Explore the atlas full screen
04

What we recommend

Set a timeline of facilities for each development tied to the handover of the housing (health center, school, library) and reserve ground floors in new blocks for neighborhood retail, starting with the developments in southeastern Madrid, which still have time.

Housing arrives before everyday life and, in twenty years, has not caught up with it.

Cadastre housing by year of construction, crossed with the proximity quintile of its census section · Madrid, Barcelona, Valencia, Zaragoza, Seville and Málaga, Spain · 2026

Facing a similar problem?

We can run this analysis for your city, with your data and your question.

Schedule a conversation

Relevant for

  • Planning institutes and departments
  • Municipal governments and councils
  • Developers and real estate funds
  • Firms that prepare plans

We also