Back to Land and Urban Regulation
One center and seven more
The eight centers hold almost a third of Cancún’s jobs, and almost two thirds of those jobs are in superblocks 4 and 5.
Centers and corridors · Where are Cancún’s centers?
Centers aren’t decreed: they are recognized where they already exist and built where we want them to exist. An urban plan that doesn’t see where jobs concentrate today may reinforce the wrong center or ignore the subcenters growing on the periphery. Before proposing anything, we need to measure where the work is.
Read the technical noteThe first two pages, online. The full note is sent by email on request.
What we found
Peripheral subcenters are growing, but trips still head downtown
Downtown grew until 2020 and declined by 2026; the airport (2.4 times) and the Central de Abasto (3.3 times) are the centers with the largest job gains. Even so, just over half of everyday trip destinations are still in the core, in subzones 1-A, 1-B and 1-C.
The centers have two and a half jobs per resident, and residents are leaving
The eight centers hold 81,000 jobs and 32,000 residents. They lost population between 2010 and 2020, and almost one in six homes is vacant, compared with one in ten citywide.
The traditional downtown is losing residents and has thousands of vacant homes
SM 4 and 5 have 51,000 jobs and 22,000 residents, fewer than in 2010, with 2,040 vacant homes and 1,610 for seasonal use.
Zoning recognizes downtown, but hardly the real corridors
The urban plan recognizes downtown: almost three quarters of its area has center zoning codes. But only 13% of its primary corridor coincides with identified centers, and only 83 of the 233 km of active corridors have corridor zoning.
See it on the map
What we recommend
In the traditional downtown, a housing target: reoccupying 3,650 homes without permanent residents would bring back some 11,000 people, several times the population it lost between 2010 and 2020.
Centers grow as places to work and empty out as places to live.
Spatial analysis (Getis-Ord Gi*), data integration and cartographic storytelling · Benito Juárez, Quintana Roo · 2026
Facing a similar problem?
We can run this analysis for your city, with your data and your question.
Relevant for
- Planning institutes and departments
- Municipal governments and councils
- Developers and real estate funds
- Firms that prepare plans